First drive through
In this phase of the calibration, you will need to travel across the field along a single track.
The illustration below shows the points which must be marked before and after the travel. Instructions on how to do this are given below the illustration.
Results of the first drive through
Stakes
To mark the outer ends of the sections prior to travel
Stakes
To mark the outer ends of the sections after travel
Barrier tape between the stakes
Marks the borders of travel
 
 
 
 
Procedure
 
 
To prepare the field for delay calibration:
1.
Start a new navigation with SECTION-Control.
2.
Position the sprayer at the start of the travel. The travel must not be positioned close to the field boundary, in order to give you sufficient space for the second travel.
3.
Extend the boom.
4.
Mark the ends of the outer sections with stakes.
5.
Travel 100 to 200 meter in a straight line before beginning to apply the clean water.
6.
After 100 to 200 meter, stop and switch off the sprayer.
7.
Save the travel in the TRACK-Leader. This will enable the calibration to be repeated.
8.
Mark the ends of the outer sections with stakes.
9.
Connect the stakes with barrier tape. This marks the borders of travel across the field.
10.
Fix the barrier tape to the ground with stones or earth.
You have now performed the first travel, and marked the application borders.