When using SECTION-Control
This section is of interest to you if you have an implement with an ISOBUS job computer and want SECTION-Control to control the sections of the implement.
- 1.
- Drive to the field.
- 2.
- If you have already worked on this field in the past, load its field data. If you want to work on a new field, you must ensure that no other field data is loaded. In this case, you must discard the opened record.
- 3.
- If you have a prescription map, you can import it now. See: If you are working with shape prescription maps
- 4.
- If you have connected the job computer to the terminal for the first time, check the settings on the “Settings” screen | “SECTION-Control”. Here, pay close attention to the “Machine type”, “Delay on start” and “Delay on stop” parameters.
- 7.
- If you are using a GPS receiver that works with EGNOS or WAAS, set the reference point.
- 8.
- As a standard, the “Parallel” guidance mode is activated. If you do not want to work with straight, parallel tracks, change the guidance mode.
- 9.
- If you want to work with overlaps, adjust the desired distance between the guidance lines.
- 10.
- Activate the automatic mode of SECTION-Control or operate the implement manually.
- 11.
- Create the first AB line.
- 12.
- Mark the field boundary (optional).
- 13.
- Mark the headlands (optional).
- 14.
- Process the field on parallel tracks. To do so, you can use the lightbar or a steering system.
- 15.
- If you are approaching an obstacle, you can mark its position.
- 16.
- After finishing work, save the data.
- 17.
- Copy the data to a USB memory device to store it on a PC or view with TRACK-Guide Desktop.